Equity research
2026.08.17 16:17

GF Securities: CPO/NPO Update

NVIDIA Spectrum-X CPO Scale-Out

Production Status: Spectrum-X Co-Packaged Optics (CPO) switches for scale-out networking have officially entered mass production.

Volume Forecasts:

2026E: 15,000 units

2027E: 100,000 units

Supply Chain Ramp: TSMC has expanded CPO inspection equipment capacity—specifically adding Insertion 2/3 capacity—alongside supply chain progress in Fiber Array Units (FAU), shuffle boxes, and system assembly.

Rubin Ultra Scale-Up Architecture & Optical Engines

Tray Design Options: Rubin Ultra is slated to adopt a 9-18-9 tray design, though mechanical challenges associated with the 0.75U height profile could drive a potential reversion to a 10-9-8 layout.

Design Impact: Architectural shifts in tray layout will have no impact on the optical engine (OE).

NVIDIA Platform OE Shipments:

2027E: 6 million units

2028E: 19 million units

Total Industry-Wide OE Shipments:

2027E: 11 million units

2028E: 40 million units

Amazon Trainium 4 & NPO Deployment

AWS Consumption Projections:

2H27E: 5 million OE units

2028E: 12 million OE units (primarily 6.4T specifications)

Configuration & Packaging: Trainium 4 is projected to feature 3 distinct configurations, with two configurations expected to adopt Near-Package Optics (NPO).

$Amazon(AMZN.US) $NVIDIA(NVDA.US)

The copyright of this article belongs to the original author/organization.

The views expressed herein are solely those of the author and do not reflect the stance of the platform. The content is intended for investment reference purposes only and shall not be considered as investment advice. Please contact us if you have any questions or suggestions regarding the content services provided by the platform.